Project:
Antigonish Main Street Bridge
Date:
June 2010 - May 2011
Scope of Work:
Earthwork and site preparation for the construction of a $4.5 Million concrete bailey bridge.
Project:
Antigonish Main Street Bridge
Date:
June 2010 - May 2011
Scope of Work:
Earthwork and site preparation for the construction of a $4.5 Million concrete bailey bridge.
Project:
Antigonish County Bank Stabilization (HADD)
Date:
May 2010 - September 2014
Scope of Work:
Installed over 10 000 tonnes of Armour Stone for the Department of Fisheries HADD projects for bank stabilization and river restoration
Project: Fairmont Wind Project
Date: June 2012 - December 2012
Scope of Work:
Fairmont Civil: Clearing and grading of the access roads, crane hardstandings and lay down areas for two Enercon E82 wind turbines. Approximately 1.2 kms of road was built along with electrical collection system.
Fairmont Turbine Foundations:
Excavations for the turbine foundations, rebar, electrical, form works, poured and backfilled two Enercon E82 wind turbines.
Projects
Copyright © 2011-2012.
All Rights Reserved.
Address
596 Cloverville Road
Antigonish
Nova Scotia - B2G 2K9
By Phone
(902) 863 5011
Fax:(902) 863 5472
Project:
Black River Wind Project
Date:
December 2012 - June 2013
Scope of Work:
The Black River Wind Project consisted of three Enercon E82 Wind Turbines.
There was one turbine located at each site in Irish Mountain, Pictou County, Creignish, Cape Breton and Cape Mabou, Cape Breton.
We provided machine works and services to excavate the foundations, install electrical and rebar, set up the concrete form work, pour and backfill the foundations.
Project:
Mile Brook Bridge
Date:
April 2012 - September 2013
Scope of Work: Northeast TCL provided machine works and services for the construction of a 20m span bridge located in Mulgrave, Nova Scotia for the NSTIR. Works included road diversions, earthworks, concrete abutments, installation of armour stone and bridge installation.
Project: Chester Wind Project
Date: August 2013 - September 2013
Scope of Work:
The 2.3 MW wind turbine located in Chester, Nova Scotia was the largest wind turbine constructed in the Atlantic Provinces. It also required the largest foundation and was the largest single day pour for the local concrete supplier (South Shore Ready Mix). Northeast TCL provided machine work and services for site preparation, to excavate the foundation, install rebar and electrical, set up the forms, pour and backfill the turbine foundation.
Project:
Hillside Boularderie Wind Project
Date:
October 2013 - December 2013
Scope of Work:
Provided machine works and services for site preparation, to excavate the foundations, install electrical and rebar, set up forms and pour the turbine foundations which were comparable to the turbine installed at the Kaizer Meadow Wind Farm in Chester.
Project: Gaetz Brook Wind Project
Date: January 2014 - June 2014
Scope of Work:
Gaetz Brook Civil: General contractor responsible for building approximately 1.5 KMs of access road, one crane hardstanding and lay down area along with electrical collection system.
Gaetz Brook Foundation: Also the general contractor for the Foundation portion of the contract. An E-92 Enercon turbine was installed. We were responsible for the foundation excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundation.
Project: Auld’s Mountain Wind Project
Date: June 2014 - November 2014
Scope of Work:
Auld’s Mountain Civil: General contractor responsible for building approximately 2.5 KMs of access road, two crane hardstandings and lay down area along with electrical collection system.
Auld’s Mountain Foundation: Also the general contractor for the Foundation portion of the contract. Two E-92 Enercon turbines were installed. We were responsible for the foundation blasting, excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project:
Sable Wind Project
Date:
July 2014 - November 2014
Scope of Work:
We were the General contractor for the Foundation portion of the Sable Wind Farm contract located in Canso, Nova Scotia. Six E-82 Enercon turbines were installed. We were responsible for the foundation blasting, excavation, installing rebar, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project:
Barrachois Wind Project
Date:
February 2015 - April 2015
Scope of Work:
We were the General Contractor for the Foundation works. Two E-92 Enercon turbines were installed. We were responsible for the foundation blasting, excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project:
Avondale Wind Project
Date:
March 2015 - April 2015
Scope of Work:
Installation of one E-92 concrete foundation. We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.
Project:
St. Croix Wind Project
Date:
May 2015 - July 2015
Scope of Work:
We were the General Contractor for the Foundation works. Four E-92 Enercon turbines were installed.
We were responsible for the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project:
CBU Wind Project
Date:
August 2015 - October 2015
Scope of Work:
We were the General Contractor for the Foundation works. Three E-92 Enercon turbines were installed.
We were responsible for the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project: Auld’s Mountain Phase II
Date: August 2015 - October 2015
Scope of Work:
Auld’s Mountain II Civil: General contractor responsible for building approximately 1 KM of access road, one crane hardstanding and lay down area.
Auld’s Mountain II Foundation: Also the general contractor for the Foundation portion of the contract. One E-92 Enercon turbine was installed. We were responsible for the foundation blasting, excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundation.
Project:
St. Croix Wind Project - Phase II
Date:
June 2016 - August 2016
Scope of Work:
We were the General Contractor for the Foundation works. Three E-92 Enercon turbines were installed.
We were responsible for the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project:
Amherst Wind Project
Date:
June 2016 - August 2016
Scope of Work:
Installation of two E-101 concrete foundations. We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.
Project:
Liverpool Wind Project
Date:
August 2016 - September 2016
Scope of Work:
Installation of two E-92 concrete foundations. We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.
Project:
Point Tupper Wind Project
Date:
April 2017 - May 2017
Scope of Work:
Demolition of existing E82 wind turbine foundation and installation of new E82 foundation including rebar, electrical, forms, concrete and all earthworks.
Project:
St. Croix Phase III Wind Project
Date:
June 2017 - July 2017
Scope of Work:
We were the General Contractor for the Foundation works. Three E-92 Enercon turbines were installed.
We were responsible for the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.
Project:
Somers Road Waterline
Date:
August 2017 - September 2017
Scope of Work:
Installation of approximately 2 kms of 200 mm water line, services, curb stops, and fire hydrants including all excavation, earthworks and reinstatement.
Project:
Cap Pele Wind Project
Date:
April 2018
Scope of Work:
Installation of one E-92 concrete foundation. We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.
Project:
Kent Hills (Phase III) Wind Project
Date:
May 2018 - September 2018
Scope of Work:
General contractor for site works and foundations for 5 x V126 turbines. Site works consisted of approximately 6.5 kms of road up grades and new road build, tree clearing, crane pads, lay down areas and reinstatement. Foundation work involved all earth works, rock hammering, rock anchors, electrical, rebar reinforcement, forms and concrete work.
Project:
Wisokolamson Wind Project
Date:
October 2018 - November 2019
Scope of Work:
Site works and foundations for 5 x V126 turbines. Site works consisted of approximately 5 kms of road up grades and new road build, tree clearing, crane pads, lay down areas and reinstatement.
Foundation work involved all earth works, rock hammering, forms and concrete work.
Project:
Richibucto (Oinpegitjoig) Wind Project
Date:
April 2019 - May 2019
Scope of Work:
Installation of one E-126 concrete foundation. We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.
Project:
Wocawson (Sussex) Wind Project
Date:
May 2019 - August 2019
Scope of Work:
Installation of 5 x E-126 concrete foundations. We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundations.
Project:
Antigonish Arena/Fairground Services
Date:
May 2020 - June 2020
Scope of Work:
Installation of 200 mm and 150 mm water lines, services, 200 mm sewermain and fire hydrants including all excavation, earthworks and reinstatement.
Project:
Antigonish Appleseed Drive Affordable Housing
Date:
October 2020 - November 2021
Scope of Work:
Installation of 50 mm waterlines, storm sewer, catch basins and manholes, 100 mm sanitary lines, concrete culverts and headwall, supply/truck/place and compact site fill material, Type 1 and Type 2 gravels, foundation excavations/backfilling, electrical trenches and site reinstatement.
Project:
Pomquet School Addition and Community Centre
Date:
June 2021 - November 2022
Scope of Work:
Responsible for site services and civil works. Scope of work includes erosion/sediment controls, site demolitions/removals, cuts/fills, building foundation excavation/backfilling, supply/install Type 1/Type 2 gravels, site services (water/storm/sanitary), underground trenching and installation of site storm detention unit.
Project:
Burchill (St. John) Wind Project
Date:
March 2022- November 2022
Scope of Work:
Installation of 10 x E-138 EP3 concrete rock anchor foundations. We were responsible for foundation excavation, rebar installation, electrical works, form works, rock anchor supply and installation pouring concrete and backfilling the foundations.