Project:

    Antigonish Main Street Bridge


Date:

    June 2010 - May 2011


Scope of Work:

    Earthwork and site preparation for the construction of a $4.5 Million concrete bailey bridge.

 

Project:

    Antigonish County Bank Stabilization (HADD)


Date:

    May 2010 - September 2014


Scope of Work:

    Installed over 10 000 tonnes of Armour Stone for the Department of Fisheries HADD projects for bank stabilization and river restoration

Project: Fairmont Wind Project

Date: June 2012 - December 2012

Scope of Work:

   Fairmont Civil: Clearing and grading of the access roads, crane hardstandings and lay down areas for two Enercon E82 wind turbines. Approximately 1.2 kms of road was built along with electrical collection system.


Fairmont Turbine Foundations: 

Excavations for the turbine foundations, rebar, electrical, form works, poured and backfilled two Enercon E82 wind turbines.


Projects

Copyright © 2011-2012.
All Rights Reserved.

Address


596 Cloverville Road

Antigonish
Nova Scotia - B2G 2K9

By Phone

(902) 863 5011


Fax:(902) 863 5472

Project:

  

    Black River Wind Project



Date:


   December 2012 - June 2013



Scope of Work:

   

    The Black River Wind Project consisted of three Enercon E82 Wind Turbines.


    There was one turbine located at each site in Irish Mountain, Pictou County, Creignish, Cape Breton and Cape Mabou, Cape Breton.


    We provided machine works and services to excavate the foundations, install electrical and rebar, set up the concrete form work, pour and backfill the foundations.

Project:

   Mile Brook Bridge

Date:

   April 2012 - September 2013


Scope of Work: Northeast TCL provided machine works and services for the construction of a 20m span bridge located in Mulgrave, Nova Scotia for the NSTIR. Works included road diversions, earthworks, concrete abutments, installation of armour stone and bridge installation.

   

Project: Chester Wind Project

Date: August 2013 - September 2013

Scope of Work:

    The 2.3 MW wind turbine located in Chester, Nova Scotia was the largest wind turbine constructed in the Atlantic Provinces. It also required the largest foundation and was the largest single day pour for the local concrete supplier (South Shore Ready Mix). Northeast TCL provided machine work and services for site preparation, to excavate the foundation, install rebar and electrical, set up the forms, pour and backfill the turbine foundation.

   

Project:

   Hillside Boularderie Wind Project

Date:

   October 2013 - December 2013


Scope of Work:

    Provided machine works and services for site preparation, to excavate the foundations, install electrical and rebar, set up forms and pour the turbine foundations which were comparable to the turbine installed at the Kaizer Meadow Wind Farm in Chester.

   

Project: Gaetz Brook Wind Project

Date: January 2014 - June 2014

Scope of Work:

  Gaetz Brook Civil: General contractor responsible for building approximately 1.5 KMs of access road, one crane hardstanding and lay down area along with electrical collection system.

Gaetz Brook Foundation: Also the general contractor for the Foundation portion of the contract. An E-92 Enercon turbine was  installed. We were responsible for  the foundation excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundation.

 

Project: Auld’s Mountain Wind Project

Date: June 2014 - November 2014

Scope of Work:

    Auld’s Mountain Civil: General contractor responsible for building approximately 2.5 KMs of access road, two crane hardstandings and lay down area along with electrical collection system.

Auld’s Mountain Foundation: Also the general contractor for the Foundation portion of the contract. Two E-92 Enercon turbines were  installed. We were responsible for  the foundation blasting, excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundations.


Project:

    Sable Wind Project

Date:

    July 2014 - November 2014

Scope of Work:

    We were the General contractor for the Foundation portion of the Sable Wind Farm contract located in Canso, Nova Scotia. Six E-82 Enercon turbines were  installed. We were responsible for  the foundation blasting, excavation, installing rebar, electrical works, form works, pouring concrete and backfilling the turbine foundations.


Project:

   Barrachois Wind Project

Date:

   February 2015 - April 2015


Scope of Work:

    We were the General Contractor for the Foundation works.  Two E-92 Enercon turbines were  installed.        We were responsible for  the foundation blasting, excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundations.

Project:

   Avondale Wind Project

Date:

   March 2015 - April 2015


Scope of Work:

    Installation of one E-92 concrete foundation.  We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.

Project:

   St. Croix Wind Project

Date:

    May 2015 - July 2015  


Scope of Work:

     We were the General Contractor for the Foundation works.  Four E-92 Enercon turbines were installed.

    We were responsible for  the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.

Project:

   CBU Wind Project


Date:

    August 2015 - October 2015

Scope of Work:

    We were the General Contractor for the Foundation works.  Three E-92 Enercon turbines were installed.

    We were responsible for  the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.

Project: Auld’s Mountain Phase II

Date: August 2015 - October 2015

Scope of Work:

    Auld’s Mountain II Civil: General contractor responsible for building approximately 1 KM of access road, one crane hardstanding and lay down area.

Auld’s Mountain II Foundation: Also the general contractor for the Foundation portion of the contract. One E-92 Enercon turbine was  installed. We were responsible for  the foundation blasting, excavation, rebar, electrical works, form works, pouring concrete and backfilling the turbine foundation.

Project:

   St. Croix Wind Project - Phase II

Date:

    June 2016 - August 2016  

Scope of Work:

     We were the General Contractor for the Foundation works.  Three E-92 Enercon turbines were installed.

    We were responsible for  the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.

Project:

   Amherst Wind Project

Date:

   June 2016 - August 2016


Scope of Work:

    Installation of two E-101 concrete foundations.  We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.

Project:

   Liverpool Wind Project

Date:

   August 2016 - September 2016


Scope of Work:

    Installation of two E-92 concrete foundations.  We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.

Project:

   Point Tupper Wind Project

Date:

   April 2017 - May 2017


Scope of Work:

    Demolition of existing E82 wind turbine foundation and installation of new E82 foundation including rebar, electrical, forms, concrete and all earthworks.

Project:

   St. Croix Phase III Wind Project

Date:

   June 2017 - July 2017


Scope of Work:

    We were the General Contractor for the Foundation works.  Three E-92 Enercon turbines were installed.

    We were responsible for  the foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the turbine foundations.

Project:

   Somers Road Waterline

Date:

   August 2017 - September 2017


Scope of Work:

    Installation of approximately 2 kms of 200 mm water line, services, curb stops, and fire hydrants including all excavation, earthworks and reinstatement.

Project:

   Cap Pele Wind Project

Date:

   April 2018


Scope of Work:

    Installation of one E-92 concrete foundation.  We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.

Project:

   Kent Hills (Phase III) Wind Project

Date:

   May 2018 - September 2018

Scope of Work:

    General contractor for site works and foundations for 5 x V126 turbines.  Site works consisted of approximately 6.5 kms of road up grades and new road build, tree clearing, crane pads, lay down areas and reinstatement.  Foundation work involved all earth works, rock hammering, rock anchors, electrical, rebar reinforcement, forms and concrete work.

Project:

   Wisokolamson Wind Project

Date:

   October 2018 - November 2019

Scope of Work:

    Site works and foundations for 5 x V126 turbines.  Site works consisted of approximately 5 kms of road up grades and new road build, tree clearing, crane pads, lay down areas and reinstatement. 


Foundation work involved all earth works, rock hammering, forms and concrete work.

Project:

   Richibucto (Oinpegitjoig) Wind Project

Date:

   April 2019 - May 2019

Scope of Work:

   

    Installation of one E-126 concrete foundation.  We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundation.

Project:

     Wocawson (Sussex) Wind Project

Date:

   May 2019 - August 2019

Scope of Work:

   

    Installation of 5 x  E-126 concrete foundations.  We were responsible for foundation excavation, rebar installation, electrical works, form works, pouring concrete and backfilling the foundations.

Project:

Antigonish Arena/Fairground Services

Date:

   May 2020 - June 2020


Scope of Work:

        Installation of 200 mm and 150 mm water lines, services, 200 mm sewermain and fire hydrants including all excavation, earthworks and reinstatement.

Project:

Antigonish Appleseed Drive Affordable Housing

Date:

   October 2020 - November 2021

Scope of Work:

        Installation of 50 mm waterlines, storm sewer, catch basins and manholes, 100 mm sanitary lines, concrete culverts and headwall, supply/truck/place and compact site fill material, Type 1 and Type 2 gravels, foundation excavations/backfilling, electrical trenches and site reinstatement.

Project:

Pomquet School Addition and Community Centre

Date:

   June 2021 - November 2022

Scope of Work:

        Responsible for site services and civil works.  Scope of work includes erosion/sediment controls, site demolitions/removals, cuts/fills, building foundation excavation/backfilling, supply/install Type 1/Type 2 gravels, site services (water/storm/sanitary), underground trenching and installation of site storm detention unit.

Project:

     Burchill (St. John) Wind Project

Date:

   March 2022- November 2022


Scope of Work:

   

    Installation of 10 x  E-138 EP3 concrete rock anchor foundations.  We were responsible for foundation excavation, rebar installation, electrical works, form works, rock anchor supply and installation pouring concrete and backfilling the foundations.